Please wait...
THANKU FOR BEING A PART OF OUR JOURNEY TO BRING "REVOLUTION IN EDUCATION"
We Genuinely APPRECIATE your PATIENCE

44
M: +2.00/-0.00

 

At a construction site, a contractor plans to make an excavation as shown in the figure.

The water level in the adjacent river is at an elevation of +20.0 m. Unit weight of water is  The factor of safety (up to two decimal places) against sand boiling for the proposed excavation is __________

[GATE CE 2018 Set 1]
A