Consider the following statements:
1) In work breakdown structure, top-down approach is adopted.
2) Duration along critical path is the shortest duration permissible.
3) PERT is probabilistic in its approach.
Which of the above statements are correct?

[ESE 2018 Prelims Paper I EE]